04-19-2022 Kemmerer Gazette Legals

Posted

MEETING NOTICE
The South Lincoln Special Cemetery District will be holding a special meeting on Tuesday April 19, 2022, at 7:00 PM to discuss/ award Diamondville Cemetery Storage Building Access Driveway Bids.
PUBLISHED: April 12, 19, 2022 04124


Department of Environmental Quality, Division of Air Quality PUBLIC NOTICE: In accordance with Chapter 6, Section 2(m) of the Wyoming Air Quality Standards and Regulations, notice is hereby given that the State of Wyoming, Department of Environmental Quality, Division of Air Quality, proposes to approve a request by Dominion Energy Questar Pipeline, LLC to install and operate thirteen (13) portable engines. The portable engines consist of seven (7) diesel engines (ENG001, ENG004-ENG009) and six (6) natural gas engines (ENG002, ENG010-ENG014) that will be operated at various gas pipeline locations in Carbon, Lincoln, Sweetwater, and Uinta Counties, Wyoming.
For the duration of the public comment period, the permit application, the agency’s analysis, and the public notice are available for public inspection online at https://openair.wyo.gov, utilizing facility ID F030052 and permit number P0034807 under permits. This material may also be viewed online, at the above URL, utilizing a public computer at the Sweetwater County Library, Green River, Wyoming. Additionally, for the duration of the public comment period a copy of this public notice is available for public inspection at the Sweetwater County Clerk’s Office, Green River, Wyoming. In accordance with the Americans with Disabilities Act, special assistance or alternate formats will be made available upon request for individuals with disabilities.
Written comments may be directed to Nancy Vehr, Administrator, Division of Air Quality, Department of Environmental Quality, 200 West 17th St., Cheyenne, Wyoming 82002 or by fax (307) 635-1784. Please reference A0013288 in your comment. Comments submitted by email will not be included in the administrative record. All comments received by 5:00 p.m., Monday, May 19, 2022 will be considered in the final determination on this application. A public hearing will be conducted only if in the opinion of the administrator sufficient interest is generated or if an aggrieved party so requests. Para español, visite deq.wyoming.gov.
PUBLISHED: April 19, 2022 04191



INVITATION FOR BID
Sealed proposals will be received for the Expand Snow Removal Equipment (SRE) Building project, addressed to Kemmerer City Hall, Kemmerer Municipal Airport, 220 State Hwy 233, Kemmerer, WY 83101 until 4:00 pm local time on April 26, 2022 , and then will be publicly opened and read. Bids received after the time fixed for the opening will not be considered.
A pre-bid meeting will be held online April 19, 2022 at 11:00 am, local time for those interested contractors, subcontractors, and suppliers. Bidders can access the pre-bid zoom meeting with the following link or zoom ID: https://jubengineers.zoom.us/j/5825826666
The project consists of, but is not limited to, site clearing and preparation, excavation and base placement, foundation placement, building erection, propane heater system modifications, electrical wiring and lighting, and other associated building work to extend an existing 24-ft wide bay of the Snow Removal Equipment (SRE) Building 15-ft to accommodate the Airport’s SRE Truck with Plow attachment mounted.
Digital copies of the Bidding Documents (including any Addenda) may be obtained from QuestCDN at www.questcdn.com upon payment of fifteen dollars ($15.00). Log on to the website and enter Quest Project # 8178254. Should you need assistance with this process, please contact QuestCDN at 952-233-1632. Partial sets of Bidding Documents will not be available from the Issuing Office.
Bids will only be accepted from registered planholders who have downloaded a set of Plans and Contract Documents from QuestCDN.com.
Each bid must be accompanied by a certified check, cash, cashier’s check, or bid bond in an amount not less than 5% of the total bid.
CIVIL RIGHTS – TITLE VI
City of Kemmerer in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The proposed contract is also under and subject to the following federal clauses:
• Affirmative Action,
• Government-wide Debarment and Suspension
• Government-wide Requirements for Drug-free Workplace
• Foreign Trade Restrictions
• Buy American Preference
• Disadvantage Business Enterprise Requirements as follows:
The Owner’s award of this contract is conditioned upon Bidder satisfying the good faith effort requirements of 49 CFR §26.53.
All required Federal Clauses including the labor provisions, and wage rates are included in the specifications and bid documents. Each bidder must supply all of the information required by the bid documents and specifications.
This project includes Federal funds and is subject to the wage provisions of Federal Davis-Bacon, and related acts.
Each bidder shall furnish the Statement of Bidders Pre-Qualifications to the OWNER with satisfactory evidence of their competency to perform the work contemplated with the bid.
The City of Kemmerer reserves the right to reject any and all proposals, waive any informalities, or irregularities, postpone the award of the Contract for a period not to exceed forty-five (45) days, and accept the proposal that is in the best interest of the City of Kemmerer. The award of the Bid is contingent upon the receipt of Federal funding.
Dated this 12th day of April, 2022.
PUBLISHED: April 12, 19, 2022 04125



IN THE DISTRICT COURT OF THE THIRD JUDICIAL DISTRICT
IN AND FOR LINCOLN COUNTY, STATE OF WYOMING
IN THE MATTER OF THE GUARDIANSHIP )
OF: )
ZOIE DAWN BURRUP, )
A Minor (DOB 1/6/2016) )
and )

RALLIE J. BURRUP, ) Case No.: PR-2022-12-DC
A Minor (DOB 6/7/2018) )
DANIEL R. CHRISTENSEN AND ROBYN E. )
CHRISTENSEN, )
Petitioners. )
NOTICE OF VERIFIED PETITION FOR APPOINTMENT OF GUARDIANSHIP
TO ALL PERSONS INTERESTED IN SAID GUARDIANSHIP:
You are hereby notified that on the 24th day of March 2022, a Verified Petition for Appointment of Guardianship, was filed by Petitioners and proposed guardians Daniel R. Christensen and Robyn E. Christensen, in regard to minor children; Zoie Dawn Burrup and Rallie J. Burrup, in the District Court of the Third Judicial District, Lincoln County, Wyoming.
Notice is further given that any person who objects to the Petition shall file a written objection with the Court and request a hearing on the matter, or in the alternative a decree by default may be entered in this matter and the Court may appoint the proposed guardians of the minor children as petitioned.
The putative father of the minor children, Zachary J. Burrup’s was unable to be served with the Petition, and his last known address was An objection to the Petition shall be filed before the expiration of the later of twenty (20) days after the mailing of this notice, or thirty (30) days after the date of last publication. If no timely objection is filed, or if a party fails to appear at any hearing, the Court may enter a decree establishing the appointment of the guardians of the minor children as stated above.
Dated: March 24, 2022.
John J. Starcevich, W.S.B. 7-5829
Edwards Law Office, P.C.
P.O. Box 5345
Etna, WY 83118
307.883.2222
john@edwardslawofficepc.com
Attorney for the Petitioner
PUBLISHED: March 29, April 5, 12, 19, 2022 03292


PUBLIC NOTICE
Pursuant to the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission’s (Commission) Rules, the Commission hereby gives notice of the Application of Rocky Mountain Power (RMP or the Company) for authority to Establish Intermediate Low-Carbon Energy Portfolio Standards pursuant to the provisions of Wyo. Stat. § 37-18-102 and Chapter 3, Section 38 of the Commission’s rules.
1. RMP is a public utility as defined by Wyo. Stat. § 37-1-101(a)(vi)(C), subject to the Commission’s jurisdiction pursuant to the provisions of Wyo. Stat. § 37-2-112.
2. On March 31, 2022, RMP filed the Application, requesting authority to establish Intermediate Low-Carbon Portfolio Standards. The Application is responsive to the requirements of Wyo. Stat. § 37-18-102 and Chapter 3, Section 38 of the Commission’s rules. It addresses Dave Johnston Units 1-4; Jim Bridger Units 1-4; Naughton Units 1-2; and Wyodak Unit 1. These facilities are utility owned, coal-fired generation facilities.
3. The Company retained the services of Kiewit Engineering Group, Inc. (Kiewit) to evaluate potential carbon capture utilization and storage (CCUS) options for the previously identified generation facilities. Based upon the Kiewit report, the Company concluded that only Dave Johnston Unit 4 and Jim Bridger Units 3 and 4 warrant further consideration for potential CCUS technology additions.
4. The Report states that Dave Johnston Unit 4 is in favorable condition, has no co-ownership complications, and is currently under no federal closure or cease-coal commitments. It also states that Jim Bridger Units 3 and 4 benefit from previously installed SCR and FGD systems, are in close proximity to Carbon Dioxide (CO2) pipelines and sequestration fields. The Report also indicates the need for consideration of hazardous waste disposal locations. CCUS also requires increased water usage. The Company estimates the cost of the CCUS projects to range between $1.484 billion and $2.39 billion, and states that it may request a higher Return on Equity for CCUS projects.
5. This is not a complete description of the Application. The Application is available for inspection by any interested person at the Commission’s offices in Cheyenne, Wyoming, during regular business hours. The Application is also available on the Commission’s website at https://psc.wyo.gov (Hot Topics), https://dms.wyo.gov/external/publicusers.aspx (Enter Record No. 17032) or RMP’s website at www.pacificorp.com.
6. Anyone wishing to file a public comment, statement, protest, intervention petition, or request for a public hearing in this matter must do so in writing filed with the Commission on or before April 22, 2022. Public comments should be submitted to wpsc_comments@wyo.gov. Any intervention request filed with the Commission shall set forth the grounds of the proposed intervention or request for hearing as well as the position and the interest of the petitioner in this proceeding. Please be sure to mention Docket No. 20000-616-EA-22 in all correspondence with the Commission.
7. If you wish to intervene in this matter or request a public hearing which you will attend and you require reasonable accommodation for a disability, call the Commission at (307) 777-7427 or write to the Commission at 2515 Warren Avenue, Suite 300, Cheyenne, Wyoming 82002. Communications impaired persons may contact the Commission through Wyoming Relay by dialing 711.
Dated: April 1, 2022.
PUBLISHED: April 12, 19, 2022 04122


IN THE DISTRICT COURT OF THE STATE OF WYOMING, IN AND FOR THE COUNTY OF LINCOLN,
THIRD JUDICIAL DISTRICT
IN THE MATTER OF THE ESTATE OF:
SAMUEL A. ARGIER,
Deceased.
Probate No: PR-2022-19-DC
NOTICE OF APPLICATION FOR DECREE OF SUMMARY DISTRIBUTION OF PROPERTY
You are hereby notified that Claiming Distributees, Thomas C. A.rgier, David J. Argier, as individuals and as Successor Trustees of the Doris G. Argier Trust dated October Pt, 1998, through their attorney Alec Lever, of Jackson Hole Law, PC, filed Application for Decree of Distribution of real property seeking an establishment of right, title, and interest to all of the decedent’s undivided interest in and to real property located in Lincoln County, Wyoming, and more particularly described as follows:
Star Valley Ranch Plat 1, Lot 15, Township 35, Range 119, Section 24, as platted and recorded in the official records of Lincoln County Wyoming, deed book 200, page 71.
PIN: 3519-241-02-033

Any objection to the application shall be filed with the Clerk of District Court of the Third Judicial District, Lincoln County, Wyoming, Lincoln County Courthouse, 925 Sage Avenue, 2nd Floor, PO Drawer 510, Kemmerer, WY 83101 within thirty (30) days from the date of the first publication of this notice, or thereafter be forever baned. If no objections are filed a decree will be sought.
Dated this 6th day of April, 2022
Alec Lever - 7-6072
Attorney for Claiming Distributees
Jackson Hole Law, PC
P.O. Box 322
Jackson, Wyoming 83001
(307)264-1665 -voice
(307)215-1218 -facsimile
PUBLISHED: April 19, 26, 2022 04193


IN THE DISTRICT COURT OF THE STATE OF WYOMING, IN AND FOR THE COUNTY OF LINCOLN,
THIRD JUDICIAL DISTRICT
IN THE MATTER OF THE ESTATE OF:
JOSEPH C. ARGIER,
Deceased.
Probate No: PR-2022-16-DC
NOTICE OF APPLICATION FOR DECREE OF SUMMARY DISTRIBUTION OF PROPERTY
You are hereby notified that Claiming Distributees, Joseph J. Argier, and Katherine fcord, through their attorney Alec Lever, of Jackson Hole Law, PC, filed Application for Decree of Distribution of real property seeking an establishment of right, title, and interest to all of the decedent’s undivided interest in and to real prope1iy located in Lincoln County, Wyoming, and more particularly described as follows:
Star Valley Ranch Plat 1, Lot 15, Township 35, Range 119, Section 24, as platted and recorded in the official records of Lincoln County Wyoming, deed book 200, page 71.
PIN: 3519-241-02-033
Any objection to the application shall be filed with the Clerk of District Comi of the Third Judicial District, Lincoln County, Wyoming, Lincoln County Comihouse, 925 Sage Avenue, 2nd Floor, PO Drawer 510, Kemmerer, WY 83101 within thirty (30) days from the date of the first publication of this notice, or thereafter be forever barred. If no objections are filed a decree will be sought.
Dated this 6th day of April, 2022
Alec Lever - 7-6072
Attorney for Claiming Distributees
Jackson Hole Law, PC
P.O. Box 322
Jackson, Wyoming 83001
(307)264-1665 -voice
(307)215-1218 -facsimile
PUBLISHED: April 19, 26, 2022 04192


PUBLIC NOTICE
1. Pursuant to the Wyoming Administrative Procedure Act and the Wyoming Public Service Commission’s (Commission) Procedural Rules and Special Regulations, notice is hereby given of the Application of Rocky Mountain Power (RMP or the Company) for an order authorizing the Company to recover costs incurred to comply with the reliable and dispatchable low-carbon energy standard pursuant to Wyo. Stat. §§ 37-18-101 and 37-18-102 and the Commission’s rules in Chapter 3, Section 38 Low-Carbon Energy Portfolio Standards.
2. RMP is a public utility, as defined in Wyo. Stat. §37-1-101(a)(vi)(C), subject to the Commission’s jurisdiction pursuant to Wyo. Stat. §37-2-112.
3. On March 31, 2022, RMP filed an Application requesting the Commission issue an order approving its proposed Schedule 198 tariff and associated ratemaking treatment. RMP states it determined that a surcharge of 0.5 percent that collects approximately $3.1 million annually is appropriate since the request for proposal process proposed in the initial carbon capture, utilization and storage plan application will have an estimated cost of $1-2 million and results of the proposed request for proposal process to analyze the identified coal units for further carbon capture analysis are not yet known. RMP is requesting a rate effective date of December 1, 2022.
4. The Company began recording the deferred costs related to the reliable and dispatchable low-carbon energy standard pursuant to Wyo. Stat. §§ 37-18-101 and 37-18-102 and the Commission’s rules in Chapter 3, Section 38 Low-Carbon Energy Portfolio Standards to its Federal Energy Regulatory Commission account, 182.3 (Other Regulatory Assets) pursuant to the Commission’s approval on January 27, 2022, in Docket No. 20000-605-EA-21. RMP proposes a carrying charge of 7.192 percent, which is the weighted average cost of capital from the most recent Commission-approved rate case; Docket No. 20000-578-ER-20. Approximately $145,000 in incremental costs, comprised of consultant fees and other internal costs, have accrued at this time.
5. This is not a complete description of the Application. Interested persons may inspect the Application at RMP’s business offices throughout Wyoming and at the Commission’s office in Cheyenne, Wyoming, during regular business hours. The Application may also be viewed online at: https://dms.wyo.gov/external/publicusers.aspx (Record No. 17029).
6. Anyone wishing to file a statement, intervention petition, protest or request for a public hearing in this matter must do so in writing filed with the Commission on or before May 2, 2022. Any intervention request filed with the Commission shall set forth the grounds of the proposed intervention or request for hearing as well as the position and the interest of the petitioner in this proceeding. Please be sure to mention Docket No. 20000-615-ET-22 in all correspondence with the Commission.
7. If you wish to intervene in this matter or request a public hearing which you will attend and you require reasonable accommodation for a disability, call the Commission at (307) 777-7427 or write to the Commission, 2515 Warren Avenue, Suite 300, Cheyenne, Wyoming 82002. Communications-impaired persons may contact the Commission through Wyoming Relay at 711.
DATED: April 1, 2022
PUBLISHED: April 12, 19, 2022 04121